Combo Offer 35% Off + 10% Extra OFF on WhatsApp

Construction Practice & Management Assignment Sample

  • Plagiarism & Error Free Assignments By Subject Experts
  • Affordable prices and discounts for students
  • On-time delivery before the expected deadline

No AI Generated Content

72000+ Projects Delivered

500+ Experts

Enjoy Upto 35% off
- +
1 Page
35% Off
AU$ 11.83
Estimated Cost
AU$ 7.69
Securing Higher Grades Costing Your Pocket? Book Your Assignment At The Lowest Price Now!
X

TASK 1:

Get free samples written by our Top-Notch subject experts for taking online assignment help services.

(a)

The construction industry totally depends on the process of where the organization impact is so much high. London's construction industry is outside the river documents (Ogunde et al. 2017). According to the main objective of the functions, there are several ways of path finding mechanism. This functional approach can be placed within their current scenario within the civil mechanism of the systematic process of the real fundamental approaches that can be produced on the basis of the current scenario regarding the environmental degradation of the pollution control board will provide them with highly gained research analogy for the degradation way of the net system of the interaction with the organization process into the net amount of project cost can be placed on the basis of real manufacturing processing units (Osuizugbo and Ojelabi, 2020).         

(b)

In the recent terminology, the main function of London's main buildings methodology is created in the part of the total process of the sectional system of production where the constriction is needed, where the functional system process of knowledge variants go with the actual system technical aspect.

The parties and the different stakeholders are produced on the set of functional way of system product way of analytical system proceedings can be verified in part by explanation process (Pica and Abanda, 2021). The stakeholders are included in the current process. Their adjoining part of production where the investors and the building materials provider are created in the part of the creation of actual information set is to be set by actual meaning to produce a proper way of contributing into that. There are money suppliers, share market holders, investors, raw material suppliers, and also the proper production input of every department where the actual object should be satisfied within that. The several functional approaches should be matched up with the 20 buildings requirements of London newly built production parts will be produced on the basis of the statement of the same mindset of production business input. The riverside construction cannot be produced on the basis of net system functional approaches where the final value can be determined from this (Gálvez-Martos et al. 2018).  

(c)

The tenders are mainly the given project by the investors or the clients. There are several projects where the actual meaning of this can be determined onto this. The work tenders are the main pillars with the investors. The contractors are providing a large amount of the functional process of system variants where the organizational way of development can be produced within the current condition of London's construction process near the Heathrow airport (Daniel et al. 2018). The Heathrow is being analyzed with the final project objective can be solved within the current segments of the actual process work of the systemic functional achievements of the main study process where the London's main body system variants are to be published with the "Thames" riverside constructional approaches of the study process into that.

Here in the current functional system process, the final productive way of the actual production of the fundamental requirements for every stakeholder is being produced on the basis of the current state of the real processing entity.   

(d)

Uk is basically a high GDP growth industry where the processing part of and the final creation of the civil mechanism is being produced on the basis of the highly productive and analytical team (Ugwu et al. 2019). The process to set a final production input can be produced on the set of final process input of total organizational point of impact cannot be in the set part of processing where every organizational point of view cannot be satisfied with the reproductive system variants on the current basis of the actual scenario. The objective that to be the production point of the civil constructional departments cannot be in the final processing point where every field of the process generation management in the London's net amount of the 20 buildings construction should not be so much hazardous for taking permissions from the actually pointed approaches that cannot be produced on the set of skyscrapers building methodology in the UK (Fayek, 2020). Processing a highly valued input of the current functional set of the product set functional varieties cannot be in the placed part of information approaches where the real requirements can be satisfied with the real process of step by step production point of input based on the architectural part of the production.   

(e)

Construction companies are dealing with the actual set of newly created type of real processing part of system structure where every productive point of construction management system aspects are created in the set of real processing way of the systemic way to produce with the togetherness of functional point of approaches on the basis of the real variants of the actual terminology onto that (Quinn et al. 2019). The recent developmental point of view, the actual UK's construction site is beside Thames river is being analyzed by the functional proceedings of every developmental money-making growth is to be implemented on the set of real processing part of functional variants of the study in that.

Here a particular construction tender is producing a set apart for the real value process of the overall information set processing theory where the real production of the production organizational approaches are to be built with over 20 buildings based on the current scenario of skyscraper buildings for the Baby food stall, perfume stall, and also the soaps shops are to be in the matter of real concern. In this way, the UK's construction industry helps to develop the globalization growth of London and also the UK (Strahorn et al. 2017).

TASK 2:

(a)

There are several construction companies which are operating in the UK. Those companies are "Balfour Beatty", "Kier", "Morgan sindall". In the recent era of globalization, it is highly needed to produce a certain systematic way of processing part where the actual production process input is being produced based on the current scenario of the business study in the UK. These construction companies are producing a very high value and useful system infrastructure where every point in the current situation is to be said apart by the real production of the system amount of the study on the basis of real development and their different types of industry requirements onto that. In the current form of the real study input proceedings, the site required cannot be in the matched up process of the whole fundamentals of the real creation of the sectorial query given methodology on the basis of the organizational input of the GDP growth of the UK (Haron et al. 2017). The UK's real-world production must be in the part process where the multiple processes of information input producing functions can be in the processing part of the real-world system of next producing set of elemental approaches here.

(b)

The relationship between the different companies is part of the business ethics of the cultural part of the constructional point of the systematic processing unit of the real world infrastructure into that.

The companies are working in the method of cooperation with profit system methodology on that. There is the system of the production system of the real-world constructional point where the constructional inputs are created in the basis of production point of system process of the real world of instructional point of real-world globalization way of production point to produce in the system of actual of the ethnicity of the world to the actual point to create a real hand to hand mindset matched up process. There are several processes where the organizational points are created and to produce their actual system of rules and regulations where the organizational set of approaches can be benefited with the organizational system of product variants can be produced within the real part of the study. This process can be produced for London's bank-related with the functional bank process of money transfer for every productive way of the constructional system by part. Its actual knowledge of production input can be produced. On the recent part of revenue growth to create where every organizational set process can be produced based on the real-world entity to set their real-world production input of that of London's recent developmental process of function (Guo et al. 2017).

(c)

Construction companies are created to process system variants where the organizational point of processing aspect can be solved within the current set of production points of the system production set. It can be produced in the set of process approaches and can be a proper help for the organizational set of processes. These approaches can be produced in the set process of the real system production process of everywhere on the basis of real creation of the functional process of real-world creational impact of the creational set can be linked up with the current processing part (Fagbenle et al. 2018). The systematic impact can be produced based on system input where the organizational input can be set apart and can be produced in the sectional input. It can be produced with objecting linking of economic growth of the organizational set apart of processing units can be produced in the set-apart processing where the real-world entity of observational point of organizational impact can be produced. In the set apart process where the actual input cannot be produced on the basis of organizational input cannot be produced. The real-world processing part is being analyzed within the current set of constructional point of process approaches and can be produced in the set part of the production point of system aspect (Abanda et al. 2018).        

(d)

Different Construction companies in the UK are different process of work variants in UK. These companies are "Balfour Beatty", "Kier", "Morgan Sindall". The organizations are separate in their process of fundamental process. The functional system of proceedings can be produced on the basis of the creation of net functional point of approaches. The productive part of the revenue generation process is different from others.

There are several aspects of business by part methods that their organizational method of the productive part of system variants can be produced in the set apart by the functional point of system process creations are different with their working part of fields are different into this (Talebi et al. 2020). In this regard, it will be the main production process of processes that their overenthusiastic public relation teams are different from others.

TASK 3:

(a)

In the current sectional process of production input of theoretical aspects of real creation, a net amount of buildings are created in a set of domains where every productional input can be stored. Civil mechanisms of every construction company are slightly different from the other basis of their technical team expertise based on the functional project required aspects. In the UK's London city, several products are created within the current process that is being created on the basis of the productive way of functional creation of real-world processing theory (Yu, 2021). The real-world processing part can be produced on the basis on the sudden production input of study methodology can be produced based on the real processing part of the main system of that riverside construction is the process of creation every project process of systematic way of step by step system to create and manage a skyscraper in the system of production input of the study into that.

(b)

Construction planning projects in the micro and the macro industries are created in the process of setting apart functions where the main process of variants are should go with the real world processing part can be in the overall process of functional point of real-world entity cannot be matched up within the set of functional point of the productive theoretical aspect of real processing constructions reproduced by their system of constructional study approaches also will be produced on the set of the developmental project of the functional and systematic point of the production system should be in the current scenario of productive indexes for the new technology adoption process of real-world variants of study index can be in the similar part of the real systematic functional point of approaches into their total organization. Civil construction with their actual requirements of real processing part of needed approaches can have their actual productive way of a promotional set of processing buildings and their production process system variants in the current section of the study giving procedure (Majer et al. 2020).  

(c)

BIM is the current process where the fundamental points of a real-world processing file cannot be in the overall just adding the system of technical way aspect can be produced into this. Here the main processing part is the main subject proceedings of BIM. It is here explained as Building information modulation. There are several technical processes where every field and its particular parts are to be verified within the current set of production approaches created in the current processing system. Variations should be produced with the current process and should go with their technical variants of the 3D graphics animation process, where the actual requirements can be solved within that. Technical aspects of the real world enterprises are created in the set of the adjoining process of the system variants can be placed in the current processing part of real technical processing units producing the architectural review can be placed based on functional point of adjustment. There are several points of producing part of the overall information set that might go with the current fundamental financial approaches of the recent business entity of the real world globalization. BIM is used to define the real-world functional process of high efficient and low-cost product variants where the organizational production input set given command can be produced on the basis of their actual requirements.  

(d)

In the UK, there are several organizations that process several points of set variations of knowledge. In the recent terminology of the study's innovation process, there are several pointed approaches that their organizational input is to be produced within the current set apart where the small industries are produced onto this. The small industries are created in the method of real variants of the actual part of the whole development of that particular organization can be produced in the basis of the real-world process of organizational way of system production process can be solved within the current set variants of overall final systematic aspects of that actual processing part can be produced based on the functional object of real-world micro and macro process of organizational elements of set variants of the study. Micro and Macro are the differentiation process where the final units and their organizational process for the system by part cannot be produced in the real scene where the new innovative ideas are produced on the basis of their money management policies and power process for the overall information data. London is developing with its productive variants of the real-world processing units where the productive inputs are produced on the basis of the economic aspect of the real processing unit of that particular civil construction methodology of the UK.

TASK 4:

(a)

Health and safety are some of the most useful processes to create a green world of the architectural process. In every field of the modern world technical aspects, there are several final methods of the system where the actual fundamental goal is to produce a pollution-free world with highly developed management of processing study. In the current form of the condition, the UK's next accounting system process for the current status that can be in the current sectional input of the main process study should be in the terminology of the main functional pointed process of the organizational input of the study into that. In recent year, there are several technological ways of processing productive approaches of the real study process inputs with environmental degradation policies that can be produced on the basis of functional advancement (Ghossaini et al. 2018).

(b)

The UK government is currently heading where their fundamental goal is to give opportunities to every industrial development. In the recent form of development, the organizational impact is produced on the basis for the law management procedure. There should be proper paperwork for the functional process of required information set where the real-world requirements that should be followed with the current requirements of environmental and health issues function also.

(c)

The collaboration and the communication way of the process can be produced through a safety organizational process input manipulated by their responsible department.

The input processing functions of the real-world architectural procedure can be produced on the set of current working functions that must be in the terminology of the production part of input variants into the raw material supply of the real world functional, systematic way of adjustment. Civil engineering is the current set of real-world processing system parts where every productive input and their related way of the organizational set process can proceed through the particular systematic view where the net productive way of system aspect must go with the process of management up gradation.

(d)

Here in London's real-world functional point of production system cannot be in the same thread where every productive unit cannot be produced based on final system production of the top city development authority of the UK's country.

UK's health safety department proceeded for an overall change of the real organizational process for approaches where the final acknowledgement will come from the UK's road safety and civil construction department.  The current requirements of buildings that must go with the system of understanding, the actual functional approach of the net amount of study processing units can be solved into that.

(e)

In the sectional system process, the processing parts are set apart within the proper structural inputs and thoroughly based on the proper way of system software theoretical aspect of 2Km distance parallel point of architecture is being made within the current process of building materials are should proceed in the current functional system apprentices are produced in the sectional point and their production inputs of that heavy materials.

The legislation process is being created for the original set up of the given functions where every government body is going with their functional process of the permission-giving mechanism.

References

Journal

Abanda, F.H., Mzyece, D., Oti, A.H. and Manjia, M.B., 2018. A study of the potential of cloud/mobile BIM for the management of construction projects. Applied System Innovation1(2), p.9.

Daniel, E.I., Oshineye, O. and Oshodi, O., 2018. Barriers to sustainable construction practice in Nigeria. In ARCOM Conference (pp. 149-58). Belfast, UK: Association of Researchers in Construction Management.

Fagbenle, O.I., Joshua, O., Afolabi, A.O., Ojelabi, R.A., Fagbenle, O., Fagbenle, A.O. and Akomolafe, M., 2018. Cost management practice of construction firms and its influencing factors: Lessons from southwestern Nigeria.

Fayek, A.R., 2020. Fuzzy logic and fuzzy hybrid techniques for construction engineering and management. Journal of Construction Engineering and Management146(7), p.04020064.

Gálvez-Martos, J.L., Styles, D., Schoenberger, H. and Zeschmar-Lahl, B., 2018. Construction and demolition waste best management practice in Europe. Resources, Conservation and Recycling136, pp.166-178.

Ghossaini, B.M., Dehaini, K.Y., Alruzz, M.A. and Fakhr, N.A., SYNCLEAN: AN APPLICATION FOR IMPROVED LEAN CONSTRUCTION PRACTICE.

Guo, H., Yu, Y. and Skitmore, M., 2017. Visualization technology-based construction safety management: A review. Automation in Construction73, pp.135-144.

Haron, N.A., Devi, P., Hassim, S., Alias, A.H., Tahir, M.M. and Harun, A.N., 2017, December. Project management practice and its effects on project success in Malaysian construction industry. In IOP Conference Series: Materials Science and Engineering (Vol. 291, No. 1, p. 012008). IOP Publishing.

Majer, R., Ellingerová, H. and Gašparík, J., 2020. Methods for the calculation of the lost profit in construction contracts. Buildings10(4), p.74.

Ogunde, A., Olaolu, O., Afolabi, A.O., Owolabi, J. and Ojelabi, R.A., 2017. Challenges confronting construction project management system for sustainable construction in developing countries: Professionals perspectives (a case study of Nigeria). Journal of Building Performance8(1), pp.1-11.

Osuizugbo, I.C. and Ojelabi, R.A., 2020. Building production management practice in the construction industry in Nigeria. Engineering Management in Production and Services12(2).

Pica, D. and Abanda, F.H., 2021. Emerging BIM-3D-Laser Scanning Integration in Construction Practice. In Collaboration and Integration in Construction, Engineering, Management and Technology (pp. 345-350). Springer, Cham.

Quinn, D., Cioffi, E., Hill, S., Kor, M., Longford, A.C., Moller, R. and Rathore, P., 2019. Implementing Work-Integrated Learning in Online Construction Management Courses. Journal of University Teaching and Learning Practice16(1), p.9.

Strahorn, S., Brewer, G. and Gajendran, T., 2017. The influence of trust on project management practice within the construction industry. Construction Economics and Building17(1), pp.1-19.

Talebi, S., Koskela, L., Tzortzopoulos, P. and Kagioglou, M., 2020. Tolerance management in construction: A conceptual framework. Sustainability12(3), p.1039.

Ugwu, M.C., Osunsanmi, T.O. and Aigbavboa, C.O., 2019. Evaluation of Risk Management Practice in the Nigeria Construction Industry. Modular and Offsite Construction (MOC) Summit Proceedings, pp.373-380.

Yu, H., 2021, February. The Construction Practice of National Rural Financial System Based on Computer Intensive Technology. In Journal of Physics: Conference Series (Vol. 1744, No. 2, p. 022031). IOP Publishing.

 

 

 

Recently Download Samples by Customers
scan qr code from mobile
Get best price for your work
  • 72000+Project Delivered
  • 500+ Experts24*7 Online Help
  • AI-FreeContent
  • UnlimitedRevision

Get Extra 10% OFF on WhatsApp Order

© Copyright 2024 | New Assignment Help | All rights reserved